Request For Quotation

Mirastech Power Systems

  1. Diagnosis of electrical system fault.
  2. Monitoring of mal-functioning of protection system
  3. Diagnosis on failure/ mal-operation of electrical equipment
  4. Monitoring of irregular power condition
  5. Optimization of energy consumption for industrial installations
  6. Condition monitoring power system
  7. Technical audit on the start-up characteristics of large power motor
  8. Technical audit on HT power transformer.
  9. Deficiency tests on power factor compensating system.
  10. Site verification of metering system by means of microprocessor-based meter test set.
  11. Rehabilitation on 33KV and 132KV power transformers including dismantling, assembling components of transformer, vacuuming transformer tank and conducting dehydration and filtration of transformer oil.
  12. Repair and rehabilitation on power switchgears such as circuit breakers and transformers.
  13. Predictive maintenance and fault diagnosis on windings of large power motors.